
[Jan-2022] Download Real SAP C_TSCM42_67 Exam Dumps Test Engine Exam Questions
New C_TSCM42_67 exam dumps Use Updated SAP Exam
C_TSCM42_67 Exam Certification Details:
| Level: | Associate |
| Duration: | 180 mins |
| Cut Score: | 63% |
| Sample Questions: | SAP C_TSCM42_67 Exam Sample Question |
| Languages: | German, English, Japanese |
| Sub-solution: | Product Developmement & Manufacturing |
| Exam: | 80 questions |
SAP C_TSCM42_67 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
NEW QUESTION 50
During the processing of production orders planned and actual costs are determined.
On which of the following objects can you collect these costs? (Choose two)
- A. Planned order
- B. Product cost collector
- C. Production order
- D. Work center
Answer: B,C
NEW QUESTION 51
What are characteristics of repetitive manufacturing? (Choose three)
- A. Continuous material consumption, production flow and output
- B. Production without using production orders and without status management
- C. Period-based planning of the quantities to be produced
- D. Automatic line loading based on capacity limits across all production lines
- E. Shop fabrication
Answer: A,B,C
NEW QUESTION 52
A user you advise wishes to transfer variable process instructions for automated processing directly to certain work centers and machines in the production department (for example, feed speed, pressing pressure, dry temperature). The user also wishes to receive variable as-is messages (such as actual quantities, actual times) from these work centers and machines and to process these messages for feedback concerning production orders. Which of the following options would you recommend to implement these requirements?
- A. Execution Steps (XSteps) and process messages
- B. SAP Application Link Enabling (ALE)
- C. Plant data collection (PP-PDC) interface
- D. SAP Business Intelligence (BI)
Answer: A
NEW QUESTION 53
Which of the following properties applies to multi-site planning in SAP ECC?
- A. When using one-step stock transfer posting, transfer stock is created in the receiving plant.
- B. Both withdrawal from an alternative plant and stock transfer from another plant are defined via special procurement keys.
- C. The use of "scope of planning" is always mandatory for multi-site planning.
- D. Multi-site planning can be activated using the corresponding planning strategy.
Answer: B
NEW QUESTION 54
Which of the following functions are available in SAP ECC when using capacity leveling? (Choose three)
- A. Batch size optimization
- B. Midpoint scheduling
- C. Finite capacity scheduling
- D. Setup time reduction
- E. Lot size optimization
Answer: B,C,D
NEW QUESTION 55
Which options can you offer someone who uses the SAP ECC system for production orders and requires support for material supply in production? (Choose three.)
- A. Material directory
- B. Pull list
- C. Pick list
- D. Logistics Information System (LIS)
- E. Automatic generation of a transport order
Answer: B,C,E
NEW QUESTION 56
Which of the following master data can be used with process orders? (Choose three)
- A. Resources
- B. Production/resource tools
- C. Master recipes
- D. Serial numbers
- E. Production versions
Answer: A,C,E
NEW QUESTION 57
After a material has been included in a NETCH material requirements planning run you change its BOM (bill of materials).
Which of the following planning file entries for this material are set by the system?
- A. The BOM explosion, the NETCH, and the NETPL planning indicators
- B. The BOM explosion and the NETPL planning indicator
- C. The NETCH and NETPL planning indicators
- D. The BOM explosion indicator
Answer: A
NEW QUESTION 58
Which of the following elements can be used in a process order? (Choose three)
- A. Process instructions
- B. Parallel sequences
- C. Suboperations
- D. Relationships
- E. Phases
Answer: A,D,E
NEW QUESTION 59
With which functions of the process order can you fulfill the requirements of the Good Manufacturing Practices (GMP) standard? (Choose three.)
- A. Resource selection
- B. Batch record
- C. Availability check
- D. Material identification and reconciliation
- E. Digital signature
Answer: B,D,E
NEW QUESTION 60
Which of the following functions does SAP Supply Chain Management (SCM) offer?
- A. Optimization of the procurement strategy with the supplier pool
- B. Planning of supply chains across company boundaries
- C. Product development, safety, quality, and maintenance
- D. Communication with customers through different interaction channels
Answer: B
NEW QUESTION 61
Your customer does not want to manage value-intensive materials in the warehouse. These materials should be procured directly for the production order.
Which BOM item category must you set to fulfill this requirement?
- A. D (document item)
- B. E (external procurement)
- C. N (non-stock item)
- D. M (phantom material)
Answer: C
NEW QUESTION 62
In SAP ECC, you calculate the standard available capacity for a work center capacity using the following data:
- Start: 7:00:00 a.m.
- End: 3:00:00 p.m.
- Break duration: 1 hour
- Rate of utilization: 80%
- Overload: 110%
- Number of individual capacities: 1
How large is the standard available capacity?
- A. 6.16 hours
- B. 8 hours
- C. 7 hours
- D. 5.6 hours
Answer: D
NEW QUESTION 63
Which issue can occur if the lot size-dependent in-house production time in the material master is not updated after changing the routing?
- A. Requirements planning creates an appropriate exception message in basic dates scheduling.
- B. Dependent requirements request the components from the bill of materials at wrong times when using basic dates scheduling.
- C. Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.
- D. Lead time scheduling cannot take place.
Answer: B
NEW QUESTION 64
Which of the following requirements is supported by using process orders?
- A. Linkage of documents to orders
- B. Use of production/resource tools
- C. Use of reference operation sets
- D. Documentation of the production using an electronic batch record
Answer: D
NEW QUESTION 65
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon is to be set equally for all materials by default.
However, some materials are to be given a different planning horizon.
What procedure would you recommend to the project team for setting the planning horizon on the system side?
- A. The planning horizon is set in the MRP groups in Customizing and the variant values are stored in the material masters for the materials in question.
- B. The planning horizon is set in the plant parameters in Customizing and variant entries are stored in the material masters for the materials in question.
- C. The planning horizon is set in the MRP groups in Customizing and variant entries are assigned via the plant parameter settings.
- D. The planning horizon is set in Customizing using the plant parameter setting and variant entries are assigned via the MRP groups for the materials in question.
Answer: D
NEW QUESTION 66
What sequence do you follow in master data maintenance to define the production of a material?
- A. Create routing -> Create work centers -> Create BOM -> Carry out component assignment in BOM or routing
- B. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in work center
- C. Create work centers -> Create routing -> Create BOM -> Carry out component assignment in work center
- D. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in BOM or routing
Answer: D
NEW QUESTION 67
The stock/requirements list for a finished product contains only one sales order and one fixed planned order with the same quantity. The availability dates for both MRP elements are on working days. The availability date for the fixed planned order is set to a later date than the one for the sales order.
However, a corresponding rescheduling exception message does not appear.
What could be the reasons? (Choose two)
- A. Requirements planning has not been carried out.
- B. The delta between the availability dates falls within the tolerance window defined in Customizing.
- C. The MRP elements are linked via fixed pegging.
- D. The fixed planned order is outside the rescheduling horizon.
Answer: B,D
NEW QUESTION 68
......
SAP C_TSCM42_67 Exam Description:
The certification "SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7" verifies the knowledge in the area of Production for the consultant profile. This certificate proves that the candidate has a basic understanding within this consultant profile and can implement this knowledge practically in projects. The SAP Certified Application Associate can contribute to the success of the planning and implementation phases of the project in a mentored role and would typically have a maximum of three years experience in the solution area. Project experience should not be prerequisite for a competent and well trained candidate to pass this exam.
Pass Your C_TSCM42_67 Dumps as PDF Updated on 2022 With 108 Questions: https://officialdumps.realvalidexam.com/C_TSCM42_67-real-exam-dumps.html
