Updated E_S4HCON2022 Dumps PDF - E_S4HCON2022 Real Valid Brain Dumps With 75 Questions! 100% Free E_S4HCON2022 Exam Dumps Use Real SAP Certified Technology Specialist Dumps NEW QUESTION 38 During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?There are 2 correct answers to this question.Response: A. In the job log for the corresponding job in [...]

[Q38-Q54] Updated E_S4HCON2022 Dumps PDF - E_S4HCON2022 Real Valid Brain Dumps With 75 Questions!

Share

Updated E_S4HCON2022 Dumps PDF - E_S4HCON2022 Real Valid Brain Dumps With 75 Questions!

100% Free E_S4HCON2022 Exam Dumps Use Real SAP Certified Technology Specialist Dumps

NEW QUESTION 38
During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?
There are 2 correct answers to this question.
Response:

  • A. In the job log for the corresponding job in SM37 (Job Overview)
  • B. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
  • C. In the corresponding R3trans log files of this phase
  • D. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log

Answer: A,D

 

NEW QUESTION 39
You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?

  • A. The start of the Execution roadmap step
  • B. The start of the business downtime
  • C. The end of the database migration
  • D. The end of the business downtime

Answer: D

 

NEW QUESTION 40
Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?

  • A. Near-Zero Downtime Technology (NZDT)
  • B. Near-Zero Downtime Maintenance (nZDM)
  • C. Downtime Optimized DMO (DoDMO)
  • D. Downtime Optimized Data Conversion (DoC)

Answer: A

 

NEW QUESTION 41
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.

  • A. SAP HANA Landscape Reorganization required a manual step to edit a file.
  • B. The target database size increases temporarily because of the Shadow Repository.
  • C. Network capacity between exporting and importing R3load processes must be.
  • D. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
  • E. The source system is non-Unicode and the target database is a scale-out system.

Answer: A,D

 

NEW QUESTION 42
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:

  • A. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
  • B. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
  • C. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
  • D. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps

Answer: A

 

NEW QUESTION 43
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.

  • A. You need to build up a SI check framework by applying SAP notes.
  • B. Depending on the SAP S/4HANA version, there are different SI check frameworks.
  • C. The SI checks are executed in the development system and the results are transported into the subsequent systems.
  • D. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.

Answer: A,B

 

NEW QUESTION 44
In ICNV. How database operations synchronized between the source and the target table?

  • A. AA
  • B. Deletes are directly executed in the target table by delete trigger.

Answer: B

 

NEW QUESTION 45
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.

  • A. The upgrade of the PRD must be finished before you start new development in the DEV.
  • B. The transport between Unicode and non-Unicode systems is forbidden.
  • C. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
  • D. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.

Answer: D

 

NEW QUESTION 46
You are performing an SAP S/4HANA conversion with DMO as an inplace migration. How does SUM transfer the data by default from the source database to the target database during the migration?

  • A. Using R3load and memory pipes
  • B. Using work processes and network socket connection
  • C. Using R3load and file transfer
  • D. Using R3load and network socket connection

Answer: A

 

NEW QUESTION 47
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.

  • A. During downtime
  • B. Post-downtime
  • C. During uptime
  • D. During SPDD

Answer: B,C

 

NEW QUESTION 48
During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?
Please choose the correct answer.
Response:

  • A. It performs a comparison of all tables using check sum.
  • B. It does NOT perform any table comparison.
  • C. It performs a comparison on all tables using row counts.
  • D. It performs a comparison on selected tables using check sum.

Answer: C

 

NEW QUESTION 49
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?

  • A. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.
  • B. AA

Answer: A

 

NEW QUESTION 50
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:

  • A. Activation of dictionary objects (ACT_UPG)
  • B. Switch to new repository (EU_SWITCH)
  • C. Conversion of application tables (PARCONVJJPG)
  • D. Modification adjustment (SPDD)

Answer: A,D

 

NEW QUESTION 51
What are the benefits of using the benchmarking option of the DMO for SUM? Note There are 2 correct answers to this question

  • A. You can find the optimal number of parallel H3load processes by monitoring host performance
  • B. You can record the modification adjustment during migration and use the transports in the next runs.
  • C. You can obtain migration duration tiles from a previous benchmark run that can be used to optimize the next runs
  • D. You can verify that the content of the download directory matches the stack XML file.

Answer: A,C

 

NEW QUESTION 52
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:

  • A. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
  • B. The SAP Support Packages that will be bound to the upgrade
  • C. The SAP Support Packages contained in the upgrade media
  • D. The SAP Support Packages found in the download directory

Answer: D

 

NEW QUESTION 53
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.

  • A. Dual Stack split
  • B. Database migration
  • C. Support Package Stack update
  • D. Homogenous system copy
  • E. Release upgrade

Answer: B,C,E

 

NEW QUESTION 54
......

Pass Your E_S4HCON2022 Exam Easily With 100% Exam Passing Guarantee: https://officialdumps.realvalidexam.com/E_S4HCON2022-real-exam-dumps.html